Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Arditi, D (1985) Construction Productivity Improvement. Journal of Construction Engineering and Management, 111(01), 1–14.

Diekmann, J E and Nelson, M C (1985) Construction Claims: Frequency and Severity. Journal of Construction Engineering and Management, 111(01), 74–81.

Laufer, A (1985) On Site Performance Improvement Programs. Journal of Construction Engineering and Management, 111(01), 82–97.

Ledbetter, B S (1985) Pioneering Construction Engineering Education. Journal of Construction Engineering and Management, 111(01), 41–51.

Maloney, W F and McFillen, J M (1985) Valence of and Satisfaction with Job Outcomes. Journal of Construction Engineering and Management, 111(01), 53–73.

Nash, W R (1985) Raise Boring in Civil and Mining Applications. Journal of Construction Engineering and Management, 111(01), 15–30.

Stewart, R F and Schexnayder, C J (1985) Production Estimating for Draglines. Journal of Construction Engineering and Management, 111(01), 101–4.

  • Type: Journal Article
  • Keywords: Drag; Production management; Excavation; Construction equipment;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1985)111:1(101)
  • Abstract:
    Dragline productin estimates, as derived from published tables, are compared to actual field production. Several equipment texts present dragline production estimating tables. The base data source for most of these tables are studies performed by the Power Crane and Shovel Association, PCSA. Only a small variance existed between the actual and estimated production.

Tavakoli, A (1985) Productivity Analysis of Construction Operations. Journal of Construction Engineering and Management, 111(01), 31–39.